The Design Center
In an effort to revitalize a disused area of historic South Boston, the Economic Development and Industrial Corporation (EDIC), a public interest company, purchased a sprawling eight-story building that contains over 1.6 million square feet. The structure, known as Building 114, underwent continuous renovation by TLT Construction Corp. making room for several burgeoning high-tech companies in the Boston area.
Modernizing the vertical transportation of Building 114 represented a unique challenge for engineers. While some freight and passenger elevators were still operable, many were not and had to be removed. These were replaced with seven new Armor freight elevators with 10,000lb. Capacities and six new passenger elevators. |
|

Kayem Foods, Inc.
TLT's project manager was responsible for the Design-Build delivery of a 70,000 sf refrigerated two story manufacturing plant addition which included extensive site work, 12 inch square precast concrete piles, concrete grade and strap beams, concrete waffle slab construction, cold storage insulated panels, exterior and interior wall construction, galvanized roof beams, acid brick flooring, new electrical service, new ammonia refrigeration system, plumbing and HVAC.
In conformance with new USDA regulations, Krack Make Up Air Units were engineered, installed and are monitored to control micro airborne particles by modulating outside air to create positive pressure in the facility. The system stored in excess of 27,000 lb of ammonia, the team worked together on a (RMP) Risk Management Program. This extensive (RMP) included close coordination with city officials, the FBI - Federal Bureau of Investigation and extensive evacuation plans for the surrounding community was established. |
Stavis Seafoods Plant
Stavis Seafoods, Inc. Selected TLT Construction Corps' Special Projects Group (TLT-SPG) as Construction Manager for their new cold storage addition and facility expansion. Phase 1 of construction is complete which included demolition of 2,500sf of existing employee facilities. The second and final phase includes the renovation of 6,000sf as well as 3,800 sf of additions, both performed over two stories. The components of construction include partitions, flooring, ceilings, electrical, plumbing and structural components to construct a new employee lounge / break room, locker room, conference room, office space, rest rooms in addition to the ammonia based cold storage addition. |
| |
|
|

Location: 215 Beacon St.
Boston, MA
Contract Value: $2,000,000
Owner: Field Corporation |
|

Location: 125 Hartwell Ave.
Bedford, MA
Contract Value: $6,000,000
Owner: Calongello &
Associates |
|
|